Project Profiles
Read about our customers’ successes in the following selected project profiles.
![](https://nitrocrete.com/wp-content/uploads/2022/11/profile-cibc-e1674535924519-300x191.jpg)
Toronto: mass concrete and high performance mix design on CIBC Towers
Long, unpredictable transit times and locally produced high-temperature cement presented challenges for constructing two center core structure towers in Toronto.
![](https://nitrocrete.com/wp-content/uploads/2022/11/profile-atl-e1674193087684-300x200.jpg)
Atlanta Mass Concrete: Speeding Up Production Rates
In 2020 in Atlanta, faster pour times and the more consistent mix led to significant cost-savings for both the Ready Mix Producer and the Contractor.
![](https://nitrocrete.com/wp-content/uploads/2022/11/bg-harbor-1-300x200.jpg)
Six-Figure Savings by Eliminating Concrete Cooling Tubes on Harbor Bridge
Corpus Christi's iconic Harbor Bridge required mass concrete for 500-foot tall towers. High humidity and ambient temperature required extreme temperature control to avoid complications with the concrete in the forms. NITROcrete™ enabled the project to meet temperature specifications without concrete cooling tubes, saving time and expense.
![](https://nitrocrete.com/wp-content/uploads/2022/11/i74-thumb-e1674535976427-300x174.jpg)
I-74 Mississippi Bridge: Lower temperature delivered over 36+ hour pours
When a previous liquid nitrogen application over-promised & under-delivered, NITROcrete™ temperature control experts met rigorous temperature specifications, on schedule.
![](https://nitrocrete.com/wp-content/uploads/2022/11/feature-matters-300x200.jpg)
Seattle: Traffic threatened to stall a 950-yard-pour
300 yards into a 950-yard pour, traffic threatened to stall progress and rack up costs. NITROcrete™ loads held their temperature when others failed. Loads that spent 95 minutes in transit held temperature within specification.
![](https://nitrocrete.com/wp-content/uploads/2022/11/proven-workability-thumb-300x200.jpg)
High Rise Construction in Atlanta: Site finishers reported “We could feel the cooling through our work boots.”
With high ambient temperatures and a high cement mix, finishers couldn't believe how easy NITROcrete™ was to work with.